Safety & Emergency Response

Electrical hazards, fuels, batteries, fire protection, and emergency planning.

Representative image. Not an official rendering or photograph of Project Mustang.

The October development agreement now supplies the current City-negotiated construction-code and backup-generator requirements, while the withdrawn August plan remains historical evidence for BESS, gas-generation, black-start and other site components whose final hazard analyses are still pending.

Last verified October 9, 2026

What the Current Project Records Show

October 2026 development agreement

Current construction-code framework

The agreement defines the 2021 editions of specified ICC codes and the 2020 National Electrical Code, while also requiring newer uniform-code editions when state law requires them for construction at the time of permit. Fire/battery/arc-flash provisions also require buildings to meet the City-enacted Construction Codes at permit application.

Current agreement
August 2026 historical proposal

Battery and electrical fire hazards addressed

The EC Plan expressly addresses fire hazards, batteries and arc-flash fire hazards as part of its safety framework. Final equipment-specific hazard analyses and response procedures are not established by the conceptual plan.

Documented topic
August 2026 historical proposal

Emergency / life-safety backup generation

The plan depicts emergency and life-safety diesel-backed generators and lists 3-MW diesel backup units, including two life-safety backup generators per data-center building.

Proposed / documented
August 2026 historical proposal

Secondary emergency access

A second Union Pacific Railroad crossing is proposed specifically for emergency access in addition to the primary access concept.

Proposed / documented
August 2026 historical proposal

BESS, gas yard and chemical/fuel support areas

The concept includes battery energy storage systems, a gas yard, gas-generation areas, and urea/fuel-related storage in addition to substations and mechanical/cooling equipment. Exact inventories and final separation distances remain subject to later engineering and permitting.

Proposed / documented
August 2026 historical proposal

Black-start generation

Separate black-start diesel generation is contemplated so portions of the on-site power system can be started without relying on normal grid or plant power. Final equipment and emergency-operating procedures remain unresolved.

Proposed / documented
October 2026 development agreement

Backup-generator operating restrictions

Emergency backup generators may generally be tested once per month during weekday daytime hours, with exhaust-direction and temporary-use restrictions. The agreement bars backup generators from sustained power export or routine substitution for permanent electrical service, subject to specified temporary-operating circumstances.

Current agreement
October 2026 development agreement

Tier 4 applies to diesel backup / non-road equipment

The agreement requires petroleum-powered diesel backup generators and other non-road equipment to comply with applicable EPA Tier 4 non-road-engine standards. This clause should not be presented as a Tier 4 requirement for the primary gas-generation plant.

Current agreement

What Is Still Unknown

  • Final battery energy-storage configuration and fire-protection design.
  • Final gas-system and generator hazard analyses.
  • Site-specific emergency-response procedures and resident notification protocols.
  • First-responder training requirements and responsibility for added equipment or staffing.
  • Final fire-water system, access geometry and hazardous-material inventories.
Official proposalFinal safety package unresolved

Primary sources: October 2026 Taylor Technology Campus development agreement / Additional Regulations; August 2026 Employment Center Plan and hearing disclosures retained as historical technical context. Documents & sources →