The October development agreement now supplies the current City-negotiated construction-code and backup-generator requirements, while the withdrawn August plan remains historical evidence for BESS, gas-generation, black-start and other site components whose final hazard analyses are still pending.
October 2026 development agreement
Current construction-code framework
The agreement defines the 2021 editions of specified ICC codes and the 2020 National Electrical Code, while also requiring newer uniform-code editions when state law requires them for construction at the time of permit. Fire/battery/arc-flash provisions also require buildings to meet the City-enacted Construction Codes at permit application.
Current agreement
August 2026 historical proposal
Battery and electrical fire hazards addressed
The EC Plan expressly addresses fire hazards, batteries and arc-flash fire hazards as part of its safety framework. Final equipment-specific hazard analyses and response procedures are not established by the conceptual plan.
Documented topic
August 2026 historical proposal
Emergency / life-safety backup generation
The plan depicts emergency and life-safety diesel-backed generators and lists 3-MW diesel backup units, including two life-safety backup generators per data-center building.
Proposed / documented
August 2026 historical proposal
Secondary emergency access
A second Union Pacific Railroad crossing is proposed specifically for emergency access in addition to the primary access concept.
Proposed / documented
August 2026 historical proposal
BESS, gas yard and chemical/fuel support areas
The concept includes battery energy storage systems, a gas yard, gas-generation areas, and urea/fuel-related storage in addition to substations and mechanical/cooling equipment. Exact inventories and final separation distances remain subject to later engineering and permitting.
Proposed / documentedAugust 2026 historical proposal
Black-start generation
Separate black-start diesel generation is contemplated so portions of the on-site power system can be started without relying on normal grid or plant power. Final equipment and emergency-operating procedures remain unresolved.
Proposed / documentedOctober 2026 development agreement
Backup-generator operating restrictions
Emergency backup generators may generally be tested once per month during weekday daytime hours, with exhaust-direction and temporary-use restrictions. The agreement bars backup generators from sustained power export or routine substitution for permanent electrical service, subject to specified temporary-operating circumstances.
Current agreementOctober 2026 development agreement
Tier 4 applies to diesel backup / non-road equipment
The agreement requires petroleum-powered diesel backup generators and other non-road equipment to comply with applicable EPA Tier 4 non-road-engine standards. This clause should not be presented as a Tier 4 requirement for the primary gas-generation plant.
Current agreement